2009-05-19_010_TornUpLanding.jpg |
Had to stop in the middle of building the new stone steps and walls, and
temporarily tear up the slate landing, to make room for heavy equipment
to build the new vestibule. See the stone steps project
here.
|
![]() |
2009-05-19_011_WestEdgeOfMainRoof01.jpg |
Tear off all shingles and plywood.
There were a few softish spots, so may as well replace all of the plywood,
and do it right.
This is the west edge of the main roof.
|
![]() |
2009-05-19_012_WestEdgeOfMainRoof02.jpg |
This is the west edge of the main roof again
|
![]() |
2009-05-19_013_WestEdgeOfMainRoof03.jpg |
Close look at the inside of the eaves on the west edge of the main roof
|
![]() |
2009-05-19_014_WestEdgeOfMainRoof04.jpg |
A little to the right of the previous pic
|
![]() |
2009-05-19_015_WestEdgeOfMainRoof05.jpg |
And to the left
|
![]() |
2009-05-19_016_WestEdgeOfMainRoof06.jpg |
|
![]() |
2009-05-19_017_WestEdgeOfMainRoof07.jpg |
West edge of main roof overhangs deck with table and plantings
|
![]() |
2009-05-19_018_SunroomRoof1.jpg |
The sunroom roof already has skylights.
The same crew put them in a few years ago.
Has lighting in the eaves.
Note the water damage at the bottom right edge of the roof.
We'll replace that.
|
![]() |
2009-05-19_019_WestEdgeOfMainRoof08.jpg |
Southwest of main roof, south of the sunroom
|
![]() |
2009-05-19_020_WestEdgeOfMainRoof09.jpg |
Closeup
|
![]() |
2009-05-19_021_WestEdgeOfMainRoof10.jpg |
|
![]() |
2009-05-19_021a_SunroomRoofJoinsMainRoof1.jpg |
Sunroom roof joins main roof
|
![]() |
2009-05-19_022_SunroomRoofJoinsMainRoofNorth1.jpg |
North joint of sunroom roof and main roof
|
![]() |
2009-05-19_023_SunroomRoofJoinsMainRoofNorth2.jpg |
|
![]() |
2009-05-19_024_SunroomRoofJoinsMainRoofNorth3.jpg |
|
![]() |
2009-05-19_025_NorthPeakOfMainRoofAndFurnaceChimney.jpg |
North peak of the main roof and the furnace chimney
|
![]() |
2009-05-19_026_BedroomRoofJoinsMainRoof.jpg |
Bedroom roof joins main roof
|
![]() |
2009-05-19_028_SouthSideOfHouse.jpg |
South side of the house.
Note that the edge of the roof is flush with the wall.
No overhang.
Let's add one while we're at it!
|
![]() |
2009-05-19_029_SouthEdgeOfSunroomRoof1.jpg |
South edge of sunroom roof.
The next few pics follow it to the right and around the corner onto the
west edge of the main roof.
|
![]() |
2009-05-19_030_SouthEdgeOfSunroomRoof2.jpg |
|
![]() |
2009-05-19_031_SouthEdgeOfSunroomRoof3.jpg |
|
![]() |
2009-05-19_032_SunroomRoofJoinsMainRoofSouth.jpg |
|
![]() |
2009-05-19_033_WestEdgeOfMainRoof11.jpg |
|
![]() |
2009-05-19_034_WestEdgeOfMainRoof12.jpg |
|
![]() |
2009-05-19_035_WestEdgeOfMainRoof13.jpg |
|
![]() |
2009-05-19_036_SunroomRoofJoinsMainRoofNorth4.jpg |
Much of the new plywood is installed now.
This is the north join of the Sunroom roof to the main roof.
|
![]() |
2009-05-19_037_SouthPeakOfMainRoofAndFireplaceChimney1.jpg |
Still need a lot of plywood on the south peak of the main roof
|
![]() |
2009-05-19_038_SouthEndOfMainRoof.jpg |
Starting to build the roof extension to have an overhang
|
![]() |
2009-05-19_039_PlumbingStackVent.jpg |
Stack vent for the plumbing of the original 2 bathrooms
|
![]() |
2009-05-19_041_NorthEdgeOfMainRoof2.jpg |
North edge of main roof.
No overhang here yet either.
We'll add one.
|
![]() |
2009-05-19_042_FireplaceChimney1.jpg |
Power and phone lines temporarily attached to the fireplace chimney while working on the roof
|
![]() |
2009-05-19_043_FireplaceChimney2.jpg |
Removing old face plate to add the roof extension
|
![]() |
2009-05-19_044_FireplaceChimney3.jpg |
|
![]() |
2009-05-19_045_FireplaceChimney4.jpg |
|
![]() |
2009-05-19_046_FireplaceChimney5.jpg |
|
![]() |
2009-05-19_047_NortheastEdgeOfMainRoof1.jpg |
Remove the face plate here too, to add the roof extension.
The roof will now wrap around the fireplace chimney some.
|
![]() |
2009-05-19_048_NortheastEdgeOfMainRoof2.jpg |
|
![]() |
2009-05-19_049_RoofExtensionSouth1.jpg |
Building the frame for the roof extension in the next few pics.
|
![]() |
2009-05-19_050_RoofExtensionSouth2.jpg |
|
![]() |
2009-05-19_051_RoofExtensionSouth3.jpg |
|
![]() |
2009-05-19_052_RoofExtensionSouth4.jpg |
|
![]() |
2009-05-19_053_ExteriorPlywoodLabeling.jpg |
Specs of the exterior plywood used for the roof
|
![]() |
2009-05-19_054_RoofExtensionNorth.jpg |
Roof extension on the north side also
|
![]() |
2009-05-19_055_SunroomRoofNorth.jpg |
Replaced some wood due to minor water damage
|
![]() |
2009-05-19_056_SunroomRoofNorthCornerJoint1.jpg |
Takes a good mind for 3D modeling to build the right support for a corner
roof join like this.
See next 2 pics also.
|
![]() |
2009-05-19_057_SunroomRoofNorthCornerJoint2.jpg |
|
![]() |
2009-05-19_058_SunroomRoofNorthCornerJoint3.jpg |
|
![]() |
2009-05-27_001_BedroomRoof1.jpg |
Tear off the entire roof of the bedroom addition also
|
![]() |
2009-05-27_002_BedroomRoof2.jpg |
Here's the stack vent for the plumbing of the new master bathroom we added
a while back
|
![]() |
2009-05-27_003_BedroomRoof3.jpg |
|
![]() |
2009-05-27_004_BedroomRoof4.jpg |
|
![]() |
2009-05-27_005_BedroomRoof5.jpg |
|
![]() |
2009-05-27_030_TrimAndEventuallyNewGutters.jpg |
Lots of trim required for new roof overhangs, and eventually all new gutters and gutter covers
|
![]() |
2009-08-19_003_RainwaterDeflectorNeededAtCornerOverDeck.jpg |
One problem after it was all done.
The new, better-designed join of the sunroom roof and main roof drains
much more efficiently, without having one gutter drain into and overflow
another.
But in heavy rain, the water moves fast and overshoots the gutter or splashes
off of the new gutter cover.
Had to add a deflector.
|