Slideshow Other Albums

2009-06-08_011_SidingRemoved1.jpg
Siding removed

2009-06-08_012_SidingRemoved2.jpg


2009-06-08_013_LivingRoomLightSwitches.jpg
Living room light switches

2009-06-08_014_LivingRoomOutlet.jpg
Living room outlet

2009-06-08_016_FrameWalls1.jpg
Framing the walls

2009-06-08_017_FrameWalls2.jpg


2009-06-08_018_FrameWalls3.jpg


2009-06-08_019_FrameRoof1.jpg
Framing the roof

2009-06-08_020_JoistsCutToFit.jpg
Joists cut to fit

2009-06-08_020a_FrameRoof2.jpg


2009-06-08_021_FrameRoofAndSkylight1.jpg
Framing the new skylight

2009-06-08_022_FrameRoofAndSkylight2.jpg


2009-06-08_024_FrameRoofAndSkylight3.jpg


2009-06-08_025_PlywoodAndSheatingOutside.jpg
Plywood and sheathing from the outside

2009-06-08_026_PlywoodAndSheatingInside.jpg
Plywood and sheathing from the inside

2009-06-08_027_VestibuleRoofJoinsMainRoof.jpg
Vestibule roof joins the main roof

2009-06-08_028_VestibuleRoofAlsoHasRidgeVent.jpg
Like the newly redone main roof, sunroom roof and bedroom roof, the new vestibule roof has a ridge vent

2009-06-08_029_VestibuleRoofCornerJoint1.jpg
Fancy framing for the corner of the main roof as it now joins the vestibule roof

2009-06-08_030_VestibuleRoofCornerJoint2.jpg


2009-06-08_031_VestibuleRoofCornerJoint3.jpg


2009-06-08_032_VestibuleRoofOverlapsMainRoof1.jpg
The new vestibule roof overlaps part of the main roof

2009-06-08_033_VestibuleRoofOverlapsMainRoof2.jpg


2009-06-08_034_InstallSkylight.jpg
Installing the skylight in the new vestibule roof

2009-06-08_035_AddShingles.jpg
Adding shingles

2009-06-08_036_GoodOverhang.jpg
Enough of an overhang to stand out of the rain while knocking on the front door

2009-06-08_037_SheathingAndRoofDone.jpg
Sheathing and roof done.  No siding or door yet.

2009-06-08_038_ViewFromGarden.jpg


2009-06-08_039_VestibuleFromTheRight.jpg


2009-06-08_045_VestibuleFromTheLeft.jpg


2009-06-15_001_ArchedCeiling1.jpg
Arched ceiling of the overhang

2009-06-15_002_ArchedCeiling2.jpg


2009-06-15_003_DecorativeBeam1.jpg
Decorative beams hanging below the real beams

2009-06-15_004_DecorativeBeam2.jpg


2009-06-15_005_DecorativeBeam3.jpg


2009-06-15_006_DecorativeBeam4.jpg


2009-06-15_007_DecorativeBeam5.jpg


2009-06-15_008_ViewFromDriveway1.jpg
The view from the driveway

2009-06-15_009_ArchedCeiling3.jpg
Adding siding to the arched ceiling and ventilated soffets to the eaves

2009-06-15_010_EastWallFromInside.jpg
The east wall (facing driveway) from inside

2009-06-15_011_SouthWallAndSkylightFromInside.jpg
The south wall (facing street) and skylight from inside

2009-06-15_012_NorthWallFromInside.jpg
The north wall (facing away from street) from inside

2009-06-15_013_TyvekHomeWrap.jpg
Tyvek home wrap

2009-06-15_014_SheetMetalTrimNeeded.jpg
Sheet metal trim needed at corner of new roof and overhang

2009-06-15_015_TrickySheetMetalCutsAndFolds.jpg
Tricky cuts and bends to create custom piece of sheet metal trim for corner of new roof and overhang

2009-06-15_016_SheetMetalTrimInstalled.jpg
Custom sheet metal trim piece installed on corner of new roof and overhang

2009-06-15_017_ViewFromStreet.jpg
The view from the street

2009-06-15_018_ViewFromDriveway2.jpg
The view from the driveway

2009-06-15_019_NewRooflineFromGarden.jpg
New roofline from the garden

2009-08-19_001_CutOutTooMuchBrick.jpg
Brita and I put back the brick where too much was cut away.  Want the brick wall of the house to extend all the way to the new vestibule wall, not switch to white siding for a few inches.

2009-08-19_002_BrickPartiallyRepaired.jpg
Brick partially repaired.  Once the mortar fully dries the color will be a good match.

2009-08-19_006_PlasticLumberFacingOfDecorativeBeam1.jpg
Plastic lumber used for the outside facing of the decorative beam

2009-08-19_007_PlasticLumberFacingOfDecorativeBeam2.jpg


2009-08-20_BoltsForDoorSillSupport.jpg
Heavy duty bolts used to bolt the new front door sill to the new concrete foundation of the vestibule